The PALM QCS has been developed to expedite the efficient hook-up and disconnection of cables and/or moorings for floating offshore renewables devices.
Typically, maintenance strategies for floating systems are based around tow to port. This can be expensive in terms of the marine spread and lost generation time.
The PALM dramatically reduces these costs by simplifying the connection and disconnection operations to the winching action of a conventional tow tug.
The PALM QCS has a unique, mechanical system that guides the electrical and/or mechanical wet mate connectors together using only the action of a winch wire
Proof of concept was demonstrated during in water trials during Summer 2022. The team are getting ready for extended reliability trials in the second half of 2023.